Our Projects - Newington Causeway Phase 2

Hero Image for Newington Causeway Phase 2  - School design structural engineers, Structural Engineers,  Residential Structural Engineers, RWP structural engineers, RWP, Concrete structure engineers, Structural engineering surrey, Chartered and structural engineers, Qualified structural engineers, Residential & Apartment block structural engineers, Structural engineering Dorking, Commercial Engineers
Image number 0 for Projects - RWP, Concrete structure engineers, School design structural engineers,  Residential Structural Engineers, Residential & Apartment block structural engineers, Qualified structural engineers, Commercial Engineers, Structural Engineers, Structural engineering Dorking, Structural Engineering firm, Structural engineering surrey,  Commercial Structural Engineers
Image number 1 for Projects - Residential Engineers, RWP,  Commercial Structural Engineers, Chartered and structural engineers, Structural Engineering firm, Concrete structure engineers, Qualified structural engineers, RWP structural engineers, Structural engineering surrey, Commercial Engineers, Structural Engineers, Residential & Apartment block structural engineers
Image number 2 for Projects -  Commercial Structural Engineers, RWP, Structural Engineers, Chartered and structural engineers, Residential & Apartment block structural engineers, RWP structural engineers, Qualified structural engineers, Structural Engineering firm, Structural engineering Dorking, Commercial Engineers,  Residential Structural Engineers, Concrete structure engineers

Newington Causeway Phase 2


Client: Neobrand

Architect: Sparc

Location: London


This was a very challenging project, 25 storey above ground with a two storey basement. The site is bounded one side by Network Rail viaduct at second floor level, being only a few meters away and on the other side by Northern line tube 13 meters below ground. The architecture had varying layouts with Hotel from ground to level 12. To gain continuity of structure an irregular layout resulted. Due to architecture cladding requirement very few columns were allowed on the perimeter. Cladding was done by Skonto, porcelain finishes with fixed glazing limiting slab deflections to fine tolerance. At level two a transfer structure was required to support 23 storeys over where the building had an under croft with only a structural zone of 600mm below slab level. We also had to undertake all the design checks satisfying all the conditions from network rail and tube line requirements. We have used Revit to exchange information with the architect using BIM.

Image number 0 for Projects - School design structural engineers, RWP structural engineers, Qualified structural engineers, Concrete structure engineers, Residential & Apartment block structural engineers, Chartered and structural engineers, Commercial Engineers, Structural Engineers, RWP, Structural engineering Dorking, Structural Engineering firm,  Commercial Structural Engineers
Image number 1 for Projects - Qualified structural engineers, Residential & Apartment block structural engineers, School design structural engineers, Chartered and structural engineers, Structural engineering surrey, Structural Engineers, Residential Engineers, Commercial Engineers, Concrete structure engineers, Structural engineering Dorking,  Commercial Structural Engineers,  Residential Structural Engineers
Image number 2 for Projects - Structural engineering surrey, Residential & Apartment block structural engineers, Chartered and structural engineers, School design structural engineers, Structural engineering Dorking, Commercial Engineers, Concrete structure engineers, RWP,  Commercial Structural Engineers, Residential Engineers, Qualified structural engineers, Structural Engineers