Hero Image for Newington Causeway Phase 2  - RWP, Structural engineering Dorking, Structural Engineers, RWP structural engineers, Residential & Apartment block structural engineers, Structural Engineering firm,  Residential Structural Engineers, School design structural engineers, Chartered and structural engineers, Structural engineering surrey, Concrete structure engineers, Commercial Engineers
Image number 0 for Projects - Qualified structural engineers, Concrete structure engineers, Commercial Engineers, RWP,  Residential Structural Engineers, School design structural engineers, Residential Engineers, RWP structural engineers,  Commercial Structural Engineers, Structural Engineering firm, Structural Engineers, Chartered and structural engineers
Image number 1 for Projects - Structural engineering surrey, RWP structural engineers,  Commercial Structural Engineers, Residential & Apartment block structural engineers, Structural engineering Dorking, Structural Engineers, School design structural engineers, RWP, Qualified structural engineers, Commercial Engineers,  Residential Structural Engineers, Structural Engineering firm
Image number 2 for Projects - Structural engineering Dorking, RWP,  Commercial Structural Engineers, Commercial Engineers, Residential Engineers, Structural Engineers, School design structural engineers, Structural Engineering firm, Structural engineering surrey, Chartered and structural engineers, Concrete structure engineers, Qualified structural engineers

Newington Causeway Phase 2


Client: Neobrand

Architect: Sparc

Location: London


This was a very challenging project, 25 storey above ground with a two storey basement. The site is bounded one side by Network Rail viaduct at second floor level, being only a few meters away and on the other side by Northern line tube 13 meters below ground. The architecture had varying layouts with Hotel from ground to level 12. To gain continuity of structure an irregular layout resulted. Due to architecture cladding requirement very few columns were allowed on the perimeter. Cladding was done by Skonto, porcelain finishes with fixed glazing limiting slab deflections to fine tolerance. At level two a transfer structure was required to support 23 storeys over where the building had an under croft with only a structural zone of 600mm below slab level. We also had to undertake all the design checks satisfying all the conditions from network rail and tube line requirements. We have used Revit to exchange information with the architect using BIM.

Image number 0 for Projects - Structural Engineering firm, Qualified structural engineers, Chartered and structural engineers, School design structural engineers, Structural Engineers, Residential & Apartment block structural engineers, Concrete structure engineers, Structural engineering surrey, RWP structural engineers, Commercial Engineers,  Residential Structural Engineers, RWP
Image number 1 for Projects - Structural Engineering firm, Qualified structural engineers, Chartered and structural engineers, School design structural engineers, Structural Engineers, Residential & Apartment block structural engineers, Concrete structure engineers, Structural engineering surrey, RWP structural engineers, Commercial Engineers,  Residential Structural Engineers, RWP
Image number 2 for Projects - Structural engineering surrey, Structural Engineers, Qualified structural engineers, Residential & Apartment block structural engineers, Structural engineering Dorking,  Residential Structural Engineers, RWP structural engineers, Concrete structure engineers, Chartered and structural engineers, School design structural engineers, Commercial Engineers, Structural Engineering firm