Hero Image for Newington Causeway Phase 2  - Qualified structural engineers, Structural Engineers, Structural engineering Dorking, Chartered and structural engineers, Residential & Apartment block structural engineers, Concrete structure engineers, School design structural engineers,  Commercial Structural Engineers, RWP structural engineers, Structural Engineering firm, RWP,  Residential Structural Engineers
Image number 0 for Projects - Structural Engineering firm, Qualified structural engineers, Commercial Engineers, Chartered and structural engineers, Concrete structure engineers,  Residential Structural Engineers, RWP structural engineers, Structural engineering Dorking, Structural Engineers, Residential Engineers, Structural engineering surrey, Residential & Apartment block structural engineers
Image number 1 for Projects - Concrete structure engineers, School design structural engineers, Residential Engineers, Residential & Apartment block structural engineers, Structural engineering surrey,  Commercial Structural Engineers, Structural engineering Dorking, Chartered and structural engineers, Qualified structural engineers, Structural Engineering firm, RWP, RWP structural engineers
Image number 2 for Projects -  Commercial Structural Engineers, Structural engineering surrey, RWP structural engineers, Structural Engineering firm, Residential & Apartment block structural engineers, Structural Engineers, Chartered and structural engineers, Structural engineering Dorking, RWP, School design structural engineers, Commercial Engineers,  Residential Structural Engineers

Newington Causeway Phase 2


Client: Neobrand

Architect: Sparc

Location: London


This was a very challenging project, 25 storey above ground with a two storey basement. The site is bounded one side by Network Rail viaduct at second floor level, being only a few meters away and on the other side by Northern line tube 13 meters below ground. The architecture had varying layouts with Hotel from ground to level 12. To gain continuity of structure an irregular layout resulted. Due to architecture cladding requirement very few columns were allowed on the perimeter. Cladding was done by Skonto, porcelain finishes with fixed glazing limiting slab deflections to fine tolerance. At level two a transfer structure was required to support 23 storeys over where the building had an under croft with only a structural zone of 600mm below slab level. We also had to undertake all the design checks satisfying all the conditions from network rail and tube line requirements. We have used Revit to exchange information with the architect using BIM.

Image number 0 for Projects - Commercial Engineers, Residential Engineers, School design structural engineers, Chartered and structural engineers,  Commercial Structural Engineers, RWP, Structural engineering Dorking, Qualified structural engineers, RWP structural engineers, Structural Engineering firm, Residential & Apartment block structural engineers, Structural engineering surrey
Image number 1 for Projects - Commercial Engineers,  Commercial Structural Engineers, Structural Engineering firm, Qualified structural engineers, RWP, Residential & Apartment block structural engineers, Residential Engineers, RWP structural engineers, Chartered and structural engineers, Structural engineering surrey,  Residential Structural Engineers, Structural engineering Dorking
Image number 2 for Projects - Chartered and structural engineers,  Residential Structural Engineers, Residential & Apartment block structural engineers, Structural engineering surrey, Residential Engineers, Structural Engineering firm, RWP, Commercial Engineers, Qualified structural engineers, Structural engineering Dorking, RWP structural engineers, Concrete structure engineers