Hero Image for Tooley Street  - Commercial Engineers, RWP, Residential & Apartment block structural engineers, RWP structural engineers, Structural Engineering firm, Structural engineering Dorking,  Residential Structural Engineers, Chartered and structural engineers, Residential Engineers, School design structural engineers, Concrete structure engineers,  Commercial Structural Engineers
Image number 0 for Projects - Concrete structure engineers, Chartered and structural engineers,  Residential Structural Engineers, Qualified structural engineers, Structural engineering Dorking, Residential Engineers, School design structural engineers,  Commercial Structural Engineers, Structural Engineers, Structural engineering surrey, RWP, Commercial Engineers
Image number 1 for Projects - School design structural engineers, RWP structural engineers, Qualified structural engineers, Residential & Apartment block structural engineers, Chartered and structural engineers, Residential Engineers, Structural engineering surrey, Commercial Engineers,  Commercial Structural Engineers,  Residential Structural Engineers, RWP, Structural Engineers
Image number 2 for Projects -  Residential Structural Engineers,  Commercial Structural Engineers, Commercial Engineers, RWP, Structural Engineering firm, Concrete structure engineers, Residential & Apartment block structural engineers, School design structural engineers, Qualified structural engineers, Structural engineering Dorking, Structural Engineers, Chartered and structural engineers

Tooley Street


Client: Jetco Investments Ltd

Location: Shad Thames, London


This was a particularly interesting project in view of the unique problems associated with the location of the building. Fixed craneage was not allowed on site nor off-loading of materials at the road side. Supply vehicles were limited to the size of a Transit van and had to drive on and off site without reversing as the road was classified as a Red Route.


A turntable was located on site and the building was constructed without any plant operated or materials stored outside the perimeter of the building line. This was achieved, with the additional constraint of full progressive collapse regulations as the building is five storeys, by using a combination of masonry, steel and timber, with timber floors.

Image number 0 for Projects - Structural Engineering firm, Chartered and structural engineers, School design structural engineers, Structural engineering Dorking, Qualified structural engineers, Commercial Engineers, Structural engineering surrey, Residential & Apartment block structural engineers, Residential Engineers,  Residential Structural Engineers, RWP, Structural Engineers
Image number 1 for Projects - Structural engineering surrey, Residential Engineers, Commercial Engineers,  Residential Structural Engineers, Residential & Apartment block structural engineers, RWP structural engineers, Chartered and structural engineers,  Commercial Structural Engineers, Concrete structure engineers, Structural engineering Dorking, Structural Engineers, School design structural engineers
Image number 2 for Projects - Structural Engineers, Concrete structure engineers, Structural Engineering firm, RWP structural engineers, School design structural engineers, Residential & Apartment block structural engineers, Chartered and structural engineers, Structural engineering Dorking, Commercial Engineers, Structural engineering surrey, Qualified structural engineers,  Commercial Structural Engineers