Our Newington Causeway Phase 2 Project

Hero Image Newington Causeway Phase 2 image come see us at Robert Wynter & Partners Limited,  Robert Wynter & Partners Limited Structural Engineers,  Commercial Structural Engineers, Structural Engineers,  Residential Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.
Thumb Image number 0 for Newington Causeway Phase 2 image come see us at Robert Wynter & Partners Limited,  Robert Wynter & Partners Limited Structural Engineers,  Commercial Structural Engineers, Structural Engineers,  Residential Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.
Thumb Image number 1 for Newington Causeway Phase 2 image come see us at Robert Wynter & Partners Limited,  Robert Wynter & Partners Limited Structural Engineers,  Commercial Structural Engineers, Structural Engineers,  Residential Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.
Thumb Image number 2 for Newington Causeway Phase 2 image come see us at Robert Wynter & Partners Limited,  Robert Wynter & Partners Limited Structural Engineers,  Commercial Structural Engineers, Structural Engineers,  Residential Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.

Newington Causeway Phase 2

1 year ago


Client: Neobrand

Architect: Sparc

Location: London


This was a very challenging project, 25 storey above ground with a two storey basement. The site is bounded one side by Network Rail viaduct at second floor level, being only a few meters away and on the other side by Northern line tube 13 meters below ground. The architecture had varying layouts with Hotel from ground to level 12. To gain continuity of structure an irregular layout resulted. Due to architecture cladding requirement very few columns were allowed on the perimeter. Cladding was done by Skonto, porcelain finishes with fixed glazing limiting slab deflections to fine tolerance. At level two a transfer structure was required to support 23 storeys over where the building had an under croft with only a structural zone of 600mm below slab level. We also had to undertake all the design checks satisfying all the conditions from network rail and tube line requirements. We have used Revit to exchange information with the architect using BIM.

Image number 0 for Newington Causeway Phase 2 image come see us at Robert Wynter & Partners Limited,  Robert Wynter & Partners Limited Structural Engineers,  Commercial Structural Engineers, Structural Engineers,  Residential Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.
Image number 1 for Newington Causeway Phase 2 image come see us at Robert Wynter & Partners Limited,  Robert Wynter & Partners Limited Structural Engineers,  Commercial Structural Engineers, Structural Engineers,  Residential Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.
Image number 2 for Newington Causeway Phase 2 image come see us at Robert Wynter & Partners Limited,  Robert Wynter & Partners Limited Structural Engineers,  Commercial Structural Engineers, Structural Engineers,  Residential Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.