Our Newington Causeway Phase 1 Project

Hero Image Newington Causeway Phase 1 image come see us at Robert Wynter & Partners Limited,  Residential Structural Engineers,  Commercial Structural Engineers,  Robert Wynter & Partners Limited Structural Engineers, Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.
Thumb Image number 0 for Newington Causeway Phase 1 image come see us at Robert Wynter & Partners Limited,  Residential Structural Engineers,  Commercial Structural Engineers,  Robert Wynter & Partners Limited Structural Engineers, Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.
Thumb Image number 1 for Newington Causeway Phase 1 image come see us at Robert Wynter & Partners Limited,  Residential Structural Engineers,  Commercial Structural Engineers,  Robert Wynter & Partners Limited Structural Engineers, Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.
Thumb Image number 2 for Newington Causeway Phase 1 image come see us at Robert Wynter & Partners Limited,  Residential Structural Engineers,  Commercial Structural Engineers,  Robert Wynter & Partners Limited Structural Engineers, Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.

Newington Causeway Phase 1

1 year ago


Client: Executive developments ltd

Architect: Panter Hudspith

Location: London


This building was 21 storey over a six meter basement built adjacent to Network rail viaduct at 2nd floor level and on the other boundary was the Northern line tube approximately 13.0 meters below ground level.


The structure on plan was only 19.0 meters by 13.0 meters width with the front portion of the building being a five-meter cantilever from level 2. Due to layout we could only have two internal main walls with an offset stability shaft on the perimeter, with no other internal structure. For such a slender high building this called upon all our engineering expertise to overcome sway and stability issues. Also, we were addressing tube line and network rail engineering and monitoring requirements. The frame is in-situ concrete with 225 thick slabs designed in SCIA FE analysis. (at that time known as Esa prima)

Image number 0 for Newington Causeway Phase 1 image come see us at Robert Wynter & Partners Limited,  Residential Structural Engineers,  Commercial Structural Engineers,  Robert Wynter & Partners Limited Structural Engineers, Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.
Image number 1 for Newington Causeway Phase 1 image come see us at Robert Wynter & Partners Limited,  Residential Structural Engineers,  Commercial Structural Engineers,  Robert Wynter & Partners Limited Structural Engineers, Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.
Image number 2 for Newington Causeway Phase 1 image come see us at Robert Wynter & Partners Limited,  Residential Structural Engineers,  Commercial Structural Engineers,  Robert Wynter & Partners Limited Structural Engineers, Structural EngineersGet a glimpse of the outstanding structural engineers work done by Robert Wynter & Partners Limited in the local Surrey area.